05·JUMP Software

Messaging MVP

A texting feature shipped in two weeks, not two quarters.

Messaging MVP — cover artifact
Company
JUMP Software
Role
UX Designer
Team
PM · Engineering · Designer
Year
May 2019

Context

JUMP helps local businesses manage their online presence. A competitive gap surfaced messaging as a churn risk, with no time for a full research cycle.

Problem

01 / 04

Build a messaging feature with no research backing it — only the signal that competitors had it and our churn was higher. The team needed buy-in and a defensible scope, fast.

Research

02 / 04

One week of lightweight, high-signal discovery aimed at validating intent and scoping the MVP.

  • →In-app AppCues survey on channels, frequency, and interest
  • →Competitive analysis of messaging-feature patterns
  • →Hypotheses framed as business + customer outcomes

Findings

03 / 04

Strong demand for SMS specifically — not chat integrations. Appointments and SMS marketing led intent; 75% of SMBs had no CRM.

""If you had the ability to message customers I never would have left." — Brooke Anderson, Nerf Arena"

Solution

04 / 04

An MVP scoped to functional, reliable, usable — send and receive SMS, nothing else. Ship to a beta cohort and let usage drive the next round of features.

  • →Send/receive SMS as the core loop
  • →A/B tested entry points; icon-in-table won over top-right CTA
  • →Milestones sequenced so dev could ship incrementally

Selected artifacts

Research, exploration, and final screens from the work.

AppCues in-app survey — channel preferences
Survey results — SMS leads intent
Competitive analysis matrix
MVP scope diagram — functional / reliable / usable
Entry-point A/B test concepts
Messaging inbox — final design
Conversation thread — final design
Send/receive SMS flow
Icon-in-table entry point
Beta cohort milestone plan

Impact

 

  1. 01

    Cross-functional buy-in secured in one week of discovery

  2. 02

    Shipped a beta MVP to production for live user research

  3. 03

    Established the pattern for future feature scoping at JUMP

Reflection

"Startups reward proportional research. The win was matching method to constraint — not skipping research, just sizing it to the decision."